CLEARED for AIR

Cleared for Air · Resources

Delivering to NETA: what your file has to meet

A plain-English summary of NETA’s 2025 file submission requirements — the wrapper and codec, the video levels, the timecode, the audio, and the caption rules that reject more files than anything else.

Written for independent producers delivering to US public television · Checked September 2026

This is my summary, not NETA’s document, and it is not official. NETA sends its own requirements with your programme instructions, and those are the ones that count — always read them before the final export. What follows is the shape of the thing, in the order it usually goes wrong.

The file: wrapper, codec and picture

Where this goes wrong An editing system will happily export something that looks identical on your monitor and is wrong in the file: 4:2:0 instead of 4:2:2, a lower-field-first flag, a long-GOP structure at the wrong bit rate. None of that is visible while you watch. It is visible the moment someone reads the file.

Video levels

Why it matters Out-of-range levels are the classic rejection: a white title at 105 IRE, a specular highlight on water, a graphic pasted from a still. One frame is enough to fail, and one frame is exactly what a human review misses.

Timecode and structure

Audio

What LKFS actually is It is the average loudness of the whole programme, not a peak. A mix can sit at −24 LKFS and still be rejected for clipping, and a mix that never clips can still be four decibels quiet. They are two different measurements, and both are checked.

Closed captions

The mistake that costs the most A caption file that starts at 00:00:00;00 against a master that starts at 01:00:00;00. Every caption lands an hour out, which reads as “captions are broken” rather than “one number is wrong”, and it is found late, usually by the distributor.

Ask NETA for the rest, before the final export

The instructions for your programme may add a maximum running time, a NETA tag at the end, a rating icon and the Producers Media Technical Evaluation Form. Ask for all of them while they are still cheap to meet — a running time that is eight seconds long is an edit; discovering it after the master is built is a re-export, a re-measure and a new caption pass.

Want your file checked against this list?

The first Delivery QC Audit is free — one free audit per production company, one file up to 60 minutes — with a written report in two business days, every item measured or checked on the picture.

Claim the free audit

See what you get first: a sample report (PDF) · the same report on a failing master (PDF)

Summary of NETA’s 2025 file submission requirements, prepared by Cleared for Air. Not affiliated with, or endorsed by, NETA — check the current requirements NETA sends you before you deliver. The source documents and the standards behind each check are listed under Resources. © 2026 Cleared for Air.